Project time: 2016
Project site: Xuzhou, Jiangsu
Our customer needed a batch of custom vibratory hammers to be paired with a Case 470 excavator for pile sinking. The steel pile diameter for a signal tower was 2.2m, and the length was 18m, meaning the pile needed to be driven into the ground in two stages. According to the excavator type and brand, and practical piling requirements, we provided the J450 vibratory hammer.
Model | J450 |
Frequency(r/min) | 2600 |
Centrifugal force(KN) | 55 |
Operating pressure(Bar) | 350 |
Flow(L) | 280 |
Dimensions(mm) | 1420*800*2420 |
Weight(Kg) | 2300 |
Hydraulic excavator base machine(t) | 42-45 |
Wuxi Jinyi Sanchang Machinery Co., Ltd.
Add.: No.572, Xi Da Road, Xin Wu District, Wuxi City, Jiangsu Province
Fax: +86-510-88553925